School holidays are often the best time to carry out refurbishment work because there are fewer people using the space. To make the most of that time, though, the planning needs to happen well before the end of term.
By the time work starts, you want the scope agreed, the required materials organised and a programme that allows time to finish, check and clean the space before it's needed again.
At Iconic, we have refurbished many school projects and the schools that engage us closer to the school holidays, end up being the most stressed. This is because they haven’t allowed enough time to plan out all the details.
If you are managing a school refurbishment during these school holidays, the first thing to confirm with your contractor is whether the work you have in mind can be completed in the time available.
Confirm when the space needs to be ready
The first day of term may not be the date you need to work towards. Teachers might need classrooms earlier to set up, or furniture and equipment may need to be moved back in before staff return.
Start with that date and work backwards. Allow time for inspections, any outstanding repairs, cleaning and the documents needed at handover.
Check who else will be on site during the holidays. There may be holiday care, office staff, community groups or other contractors using parts of the school. Their access needs to be considered when deciding where the work area, deliveries and storage will go.
Giving the contractor those details early helps them build a programme around the time and space that's actually available.
Be clear about what needs improving
It helps to explain what isn't working about the existing space before deciding what to replace.
A bathroom might be difficult to keep clean, a classroom layout may no longer suit how it's used, or the flooring may be worn in busy areas. If accessibility is part of the work, relevant consultants may need to help develop the scope.
Once everyone understands the issues at hand, it's easier to discuss the options and decide which work needs to happen during the upcoming holidays.
When we refurbished four bathrooms at a Public School, we restored the existing stainless-steel fixtures. Checking what can still be used is a worthwhile part of planning any refurbishment.
Arrange an inspection before finalising the work
Give the contractor and relevant consultants access to the areas being refurbished. Share any drawings, maintenance records and hazardous materials information you have.
Ask what they can confirm during the inspection and what they won't know until work begins. If the work could disturb materials suspected of containing asbestos or other hazards, arrange the appropriate assessment before anyone starts demolition or opens up those areas.
For a bathroom refurbishment, this includes looking at the existing plumbing and the surfaces beneath the proposed finishes. The programme also needs to allow for waterproofing, required inspections and the waiting times specified for the products being used.
Choose fixtures and finishes early enough to check availability and arrange delivery before they're needed.
Agree on who can approve changes
If something unexpected is found during the work, the contractor needs to know who to contact and who can make a decision. This is particularly important when school staff are on leave.
Agree on a contact for the school and the contractor, and confirm who can approve changes during the holidays.
Before work starts, also confirm:
Who will provide keys, alarm codes and gate access.
Where deliveries can arrive and contractors can park.
Which areas need to stay accessible.
Whether services need to be interrupted and who needs notice.
How unexpected issues will be reported.
If all the work won't fit into one holiday period, discuss whether it can be completed in stages. Agree on what each stage includes and what will be ready for the school to use afterwards.
Allow time to check the finished work
Agree early on what the school will receive at handover. Depending on the work, that may include warranties, certificates, inspection records and instructions for looking after new finishes or equipment.
Walk through the space with the contractor before it's handed back. Check that it's ready to use and that any outstanding items have been recorded, with a plan for completing them.
Before you book school holiday works
Check these details before confirming the programme:
The date staff need the space ready, including time to move furniture back in.
The agreed work, selected fixtures and finishes, and delivery dates.
Who needs access during the holidays and any areas that must stay open.
Who can approve changes and what needs to be checked before handover.